Sessional Paper No. 75 of 1955 on the Bulk Supply of Electricity from Uganda
View/ Open
Publication Date
1955Author
Type
Sessional Paperviews
downloads
Metadata
Show full item recordBy
Colony and Protectorate of Kenya
Abstract/ Overview
Present estimates of future demand for electricity in Kenya indicate that the existing hydro-electric and thermal reserves of the East African Power and Lighting Co. Ltd. with some additional plant, should be sufficient to meet foreseeable demands until the beginning of 1958. The development of further hydroelectric power in Kenya at Seven Forks on the Tana River would involve very heavy capital expenditure which would not at this stage be justified by estimates of future demands for electric power, although such a development or its equivalent is likely to be necessary at a later date. The provision of additional major thermal generating capacity would entail heavy capital and operating expenditure with a resultant high price for electricity to the consumer…
Further Details
A Sessional Paper on the Bulk Supply of Electricity from Uganda
Affiliated Ministerial Docket
Ministry of Energy and PetroleumPublisher
The Government PrinterSeries
Sessional Paper No. 75 of 1955;Collections
- Sessional Papers [401]